Exhibit 2.1 - Project Location in Romania
Exhibit 2.2 - Current Conditions
Exhibit 2.3 - Site Layout Plant - end of year 00 A
Exhibit 2.3 - Site Layout Plant - end of year 00 B
Exhibit 2.4 - Site Layout Plant - end of year 07 A
Exhibit 2.4 - Site Layout Plant - end of year 07 B
Exhibit 2.5 - Site Layout Plant - end of year 14 A
Exhibit 2.5 - Site Layout Plant - end of year 14 B
Exhibit 2.6 - Site Layout Plant - end of year 16 A
Exhibit 2.6 - Site Layout Plant - end of year 16 B
Exhibit 2.7 - Site Layout Plant at mine closure - end of year 19
Exhibit 2.8 - Facilities Related to the Construction Phase
Exhibit 2.9 - Mine Roads and Access Roads
Exhibit 2.10 - Processing Plant Site
Exhibit 2.11 - Simplified Overall Process Flow Diagram
Exhibit 2.12 - Ore Receiving, Crushing and Stockpile Process Flow Diagram
Exhibit 2.13 - Grinding Circuit
Exhibit 2.14 A - Leaching/Adsorption Process Flow Diagram
Exhibit 2.14 B - Leaching/Adsorption Process Flow Diagram
Exhibit 2.15 - Elution/Regeneration Process Flow Diagram
Exhibit 2.16 - Electro-winning and Smelting Process Flow Diagram
Exhibit 2.17 - Thickening & Cyanide Detoxification Process Flow Diagram
Exhibit 2.18 - Tailings Management Facility Final Dam
Exhibit 2.19 - Tailings Management Facility Schematic
Exhibit 2.20 - Cross-Sections throught Main Dam and Secondary Containment Dam
Exhibit 2.21 - Major Transport Routes
Exhibit 2.22 - Simplified Water Balance - Schematic Flow Balance
Exhibit 2.23 - Detailed Water Balance - Schematic Flow Balance
Exhibit 2.24 - Ausenco Carbon Regeneration Process Flow Diagram
Exhibit 2.25 - Ausenco Lime Storage and Preparation Flow Diagram
Exhibit 2.26 - Ausenco Cyanide and Sodium Hydroxide Mixing Flowsheet
Exhibit 2.27 - Ausenco Copper Sulphate and Sodium Metabisulphite Mixing Flowsheet
Exhibit 2.28 - Ausenco Flocculant Mixing and Hydrochloric Acid and Carbon Dioxide Storage Flowsheet
Exhibit 2.29 - Ausenco Air Compressor Schematic
Exhibit 2.30 - Ausenco Fresh Water Distribution Schematic
Exhibit 2.31 - Ausenco Gold Smelting and Mercury Retort Flowsheet
Exhibit 2.32 - Ausenco ARD Treatment Flowsheet
Exhibit 2.33 - Ausenco Truck Wash and Fuel Storage Facility Schematic
Exhibit 2.34 - Ausenco Processing Plant Design Criteria
Exhibit 2.35 - Ausenco Processing Plant Design Criteria
Exhibit 2.36 - Ausenco Reagent Design Criteria
Exhibit 2.37 - Ausenco Services Design Criteria
Exhibit 2.38 - Geotechnical Exploration Map
Exhibit 2.39 - TMF Geotechnical Cross-Sections
Exhibit 2.40 - TMF Geotechnical Cross-Sections
Exhibit 2.41 - TMF Geotechnical Cross-Sections
Exhibit 2.42 - Surface Water Diversion Channels Corna Valley
Exhibit 2.43 - Starter TMF and SCD Excavation Plan
Exhibit 2.44 - Starter TMF and SCD Dam Plan
Exhibit 2.45 A - Starter TMF and SCD Starter Dam Cross Sections and Details
Exhibit 2.45 B - Starter TMF and SCD Starter Dam Cross Sections and Details
Exhibit 2.46 - Final Tailings Management Facility & Secondary Containment Dam Plan (at closure)
Exhibit 2.47 - Final Tailings Management Facility & Secondary Containment Dam Plan Cross Section
Exhibit 2.48 - TMF Filling Plan Sequence
Exhibit 2.49 - Starter TMF Basin Preparation Plan
Exhibit 2.50 - Schematic Geological Cross Section